Fill dirt calculator
Measure each area in feet, enter how deep the fill needs to be, and get the yards of dirt to order — with the compacted-fill allowance shown as its own line, per soil type, never silently baked in.
Enter at least one area and a fill depth to see how many yards of dirt to order.
How this is calculated
- Shape areas are summed and multiplied by the fill depth:volume = total area × depth (at depth d inches,cubic yards = square feet × d ÷ 324).
- For a compacted fill, the dirt to order isfinished volume × (1 + allowance), where the allowance is WisDOT's “expand the fill” range for your soil type — shown as its own line. A loose dump skips it and will settle instead.
- No tonnage line, on purpose: engineering sources publish weight-volume conversion factors for aggregates, not natural soil. Fill dirt is bought by the cubic yard; where a supplier quotes by the ton, their scale-ticket conversion governs.
Data used, with sources
| Value | Used as | Source |
|---|---|---|
| Compaction allowance +10–35 % by soil type | per-soil ranges: clean sands 10–15 %; silty sands 15–25 %; silts 20–30 %; silty clays and clays 25–35 % — default is the full span when the soil type is unknown | Wisconsin Department of Transportation / Wisconsin Highway Research Program |
WisDOT’s "expand the fill" guideline (Table 1.1, WisDOT 2017): a compacted fill consumes 10–35 % more soil than its finished volume, depending on soil type — clean sands the least, silty clays and clays the most. The default 0.20 sits in the overlap of the silty-sand and silt ranges, the middle of the table when the soil type is unknown. WHRP’s Wisconsin field measurements ran lower than the guideline for some soils (clays measured −5 to +9 %), so treat the allowance as a planning margin, not a precision figure.
How many yards of dirt for a given area
The arithmetic is fixed — square feet × depth in inches ÷ 324— so the real work is measuring honestly. Fill depth is rarely uniform: a settling trench is deeper at one end, a low lawn spot feathers to nothing at its edges. Measure the depth at several points and use a representative average, or split the area into sections at different depths and add them as separate entries above. For a hole or an above-ground grade change, measure to the finished grade you want, not to where the dirt pile will first stand — that difference is exactly what the compaction allowance accounts for.
Why the allowance depends on soil type
Sandy fill packs nearly as tight as it arrives; clay arrives in clods full of voids and loses far more volume under the compactor. That is why the cited table runs from10 % for clean sands up to35 % for clays, and why the calculator asks. If you do not know what the pit will send, the full-range default brackets the order — ask the supplier what class of material they are loading, and use their answer.
Common mistakes
- Ordering the bare geometric volume for a compacted fill.The fill consumes 10–35 % more than the finished shape; that is the allowance line, not a fudge factor.
- Dumping deep fill in one lift and expecting it to hold grade. Uncompacted fill settles for seasons. If the surface matters, compact in shallow lifts — and if a structure rides on it, that is engineering, not landscaping.
- Filling planting areas with fill dirt alone.It is subsoil. Cap with topsoil where anything needs to grow.
- Treating a quoted “yard of dirt” weight as fact. Moisture alone moves a yard by hundreds of pounds; only the scale ticket is real.
Frequently asked
How many yards of dirt do I need?
How much does a yard of dirt weigh?
What is the difference between fill dirt and topsoil?
Why does compacted fill need extra dirt?
Sources
- Weight-Volume Relationships and Conversion Factors for Soils and Aggregates of Wisconsin (WHRP G22-05) — Wisconsin Department of Transportation / Wisconsin Highway Research Program, accessed 2026-08-02.
- Effects of Soil Compaction — Penn State Extension, accessed 2026-07-31.
Quantities on this page are planning estimates, not engineering advice or a purchase guarantee — product sizes vary by producer, so confirm coverage with your supplier before ordering.Structural fill under buildings, slabs, or pavements is an engineering matter — follow your geotechnical specification and local code.